Photos by Crystal Reed
Demolition of Old City Building Begins
The demolition of the old city building began on Monday, February 6. A new city building will be built on the same spot in the near future. The building had indoor air quality and structural issues including 5,400 square feet of asbestos floor tile, holes and missing brick and mortar in structural foundation walls intended to hold multiple vaults, extensive mold growth in the HVAC system that serviced personnel workspaces and recommendations to utilize hazmat suits when accessing the second floor. Asbestos abatement was done before demolition began on the building.