Lake Shelbyville Winter Drawdown Delayed
The Lake Shelbyville U.S. Army Corps of Engineers will postpone winter drawdown to early or mid January as requested by Water Control Department of the St. Louis District. The current Water Control Plan at Lake Shelbyville calls for winter drawdown to begin on December 15 (+/- 14 days).
Login or Subscribe to read the rest of this story.